The Net-Brainer

The Net-Brainer (http://forums.netbraintech.com/index.php)
-   NetBrain Product (http://forums.netbraintech.com/forumdisplay.php?f=19)
-   -   FAQ: For a switch with hundreds of ports, does NetBrain draw all ports? How does NetBrain show a multi-slot chassis like a 4500 or 6500? (http://forums.netbraintech.com/showthread.php?t=16332)

NetBrainTAC 12-20-2012 07:49 AM

FAQ: For a switch with hundreds of ports, does NetBrain draw all ports? How does NetBrain show a multi-slot chassis like a 4500 or 6500?
 
By default, NetBrain L2 map will draw up to 48 ports for a switch and hide the rest of ports for better layout. A user has the option to show/hide any or all ports in a switch. A multi-slot chassis is treated as one switch.


All times are GMT -4. The time now is 04:56 PM.

Powered by vBulletin® Version 3.8.2
Copyright ©2000 - 2019, Jelsoft Enterprises Ltd.
Copyright 2009 NetBrain, Inc. All rights reserved.